Version for printMainProjectsProjects in 1998
| England, September 1998 | Optimal Software Ltd. |
| Survey of 100 km of 11 kV and 33 kV overhead power transmission lines for Optimal Software Ltd. The objective was to survey existing power lines and produce detailed and updated documentation. | |
| Russia August-September 1998 | Rostelecom |
| Survey of 3,000 km of 220 kV overhead power lines as part of our fiber optics telecommunication line design project, Ulan-Ude – Belogorsk. The objective was to survey existing power lines and produce detailed and updated documentation. | |
| Argentina, June 1998 | ABB |
| Airborne laser survey and mapping for new power line design and construction, Olavaria – Buenos Aires, 100 sq. km. Deliverables included feature-coded laser data in ASCII format and high-resolution digital orthophoto. | |
| England, June 1998 | The National Grid Company |
| Survey of 100 km of 400 kV overhead power transmission lines for The National Grid Company. The objective was to survey existing power lines and produce detailed and updated documentation. | |
| Italy, May 1998 | Aquater |
| River basins relief and topography mapping of 3,000 sq. km for Aquater. The survey objective was to obtain precise elevation data for flood control. Deliverables included digital terrain model (bare-earth) and digital surface model. | |
| Russia, April 1998 | Rostelecom |
| Survey of 600 km of 110 kV and 220 kV overhead power lines as part of our fiber optics telecommunication line design project, Perm – Igevsk. The objective was to survey existing power lines and produce detailed and updated documentation. |